Il centro-a-centro include accesso all'aeroporto, margine di sicurezza, uscita e trasferimento in centro.
L'aereo emette circa 6× più CO₂ del treno su questa tratta.
I prezzi variano con la finestra di prenotazione — vedi la scheda prenotazione sotto per le fasce attuali.
Il corridoio.
Start with the stored timetable.
Booking guidance is not researched yet. This page keeps the finished-page structure and marks missing fare, station, and operator details as pending — check back once you've settled on fly or train for this trip.
Dovresti prendere il treno?
Il tempo di volo pubblicizzato non è porta a porta. Aggiornato Stored data refresh.
RailOrFlight has not published final route-specific conclusion copy for London to Edinburgh yet. Use the sections below to weigh train or fly for this route with stored rail, flight, and CO2e data where it exists; the verdict above is the MVP seed verdict.
Rail data is pending: no usable stored timetable sample has loaded for this route yet.
Flight data is present: the latest stored sample shows a Data pending median scheduled block and 162 flights/week.
CO2e data is present: the current baseline estimates ~59 kg saved by rail.
LLM-assisted conclusion copy and proofreading are not wired into this public page yet, so unresolved fields are left explicit rather than guessed.
Riga per riga.
| In treno | In aereo | Nota | |
|---|---|---|---|
| City-to-city time | Data pending | Data pending Pareggio | Flight block data is not in the stored snapshot yet. |
| Stations vs airports | London centre to Edinburgh centre Vince | Airport access data pending | Station and airport transfer details still need route-specific editorial review. |
| Typical one-way price | Data pending | Data pending Pareggio | Fare data is not stored for this route yet. |
| CO2 per passenger | ~12 kg Vince | ~71 kg | Baseline estimate from stored distance and IEA factors; rail saves ~59 kg. |
| Frequency | Rail frequency data pending | 162 flights/week Pareggio | Stored snapshot sampled 0 rail journeys and 162 weekly flights. |
| Number of transfers | Transfer data pending | Airport rail legs pending Pareggio | Rail transfer count comes from the stored timetable sample when available. |
| Working / sleeping | Train comfort details pending Vince | Flight comfort details pending | Qualitative comfort copy is pending assisted drafting and editorial review. |
| Luggage | Rail baggage rules pending Vince | Airline baggage rules pending | Route-specific luggage notes have not been researched yet. |
| Operations signal | Rail operations data pending | Carriers BA, LM Pareggio | Latest stored snapshot gathered 2026-07-10T12:21:53.352Z. |
Se prendi il treno.
Booking source pending.
RailOrFlight does not have a usable stored rail sample for this route yet.
Station and airport transfer notes pending.
The page keeps this slot for the real-world access notes: which station to use, how airport access changes the clock, and where transfers become fragile.
Risk profile pending.
Delay, disruption, and missed-connection risk will be filled once GTFS/OTP data and editorial review are available.
Guarda il treno più da vicino.
"Delay profile pending: no stored rail sample is available yet."
Disruption risk has not been scored for this route yet.
Transfer fragility still needs review.
"Scenic notes are pending for this route."
Operator and ticketing notes are pending.